Wednesday, September 12, 2007

Electrical and Plumbing is in!

This is what our house looks like today. They put in a temporary front door.

They delivered the bathtubs and shower stuff today! This is the garden tub for the master bathroom. At the bottom of the picture is the box with the upstairs bathtub in it. All of this stuff is in the garage.
Here is the fireplace in the family room!
They have also worked on the electrical and airduct stuff that goes in the walls and ceiling. This was taken in the family room.
This is picture is taken from the kitchen and looking into the master bathroom. The red and blue pipes are the hot and cold water that will go to the his and her bathroom sinks. The blue tube on the left is leading to where the refrigerator will go in the kitchen on this side of the wall.

No comments: